Description
IDA Logo

Projects

Description

Bracknell & Wokingham College

Project Cost: £36 Million


The £36 million pound project which is a eight-storey landmark educational building with a capacity for 1,500 students was constructed in 2008/09 with Integrated Design Associates being responsible for the Mechanical & Electrical Design and implementation of the systems within the building. IDA Ltd developed working drawings, carried out all calculations, Size plant and distribution systems, calculated space allocation, generated service routes, calculated budget estimates, managed cost control, etc and assisted with the project management of the project works.

The existing college was demolished and the new building was constructed from the ground up and included a Category B fit out with the arrangement of incoming supplies, design of Mechanical & Electrical Plant Rooms. The building consisted of offices, general classrooms, laboratories, dedicated work shops, hair & beauty studios, motor vehicle work shop, drama studio, sports hall and more.

Integrated Design Associates have undertaken a broad range of projects in both the Private & Public Sectors.

We have added a small collection below of projects we have been involved with 

together with a description of the project works we were responsible for.

National Society for Epilepsy at Chalfont Centre
Project cost: £650K


IDA Ltd were the Electrical consultant responsible for the design & implementation of the new Electrical LV Distribution Networks and associated switch gear including the new Electrical Sub Station on the site to replace the life expired installations. The works were phased over 3 stages running consecutively one after another. IDA Ltd duties consisted of surveys, Design, electrical loading calculations, sizing of plant and distribution, specification, drawings, tender documentation, tender analysis, Project management, cost management, inspections, snagging and signing off of the project works .

Wasing Park Stables Block Conversion
Project Value: £450K


IDA Ltd worked in conjunction with MV Mechanical to convert the derelict stable block into a luxurious 26 bedroom Stables Lodge.

The property is a prestigious venue on a large estate consisting of a chaple, wedding venue, secret gardens, etc.

IDA Ltd 's duties consisted of the Surveying of the property, all design development aspects of the project both Mechanical & Electrical, generation of specifications and drawings and the witnessing of the commissioning and testing of the system installations.

Project Name

Project Description





Description
Description
Description
Description


window.dataLayer = window.dataLayer || [];
function gtag(){dataLayer.push(arguments);}
gtag('js', new Date());

gtag('config', 'UA-140176320-1');
$SIGNUP$
$VALIDATION$
Working... Please wait